Justification of preliminary sizing and interconnection scheme for a distributed generation unit serving an area with abnormal power demand
https://doi.org/10.25206/1813-8225-2026-199-80-87
EDN: UBWTLM
Abstract
The article examines the problem of the justification of preliminary sizing and interconnection scheme for a distributed generation unit serving an area with abnormal power demand relative to the normative level. The research extends the previously completed stage of interval estimation of the technocenosis of municipal entities within the Prokopyevsky district of the Kemerovo Region (Kuzbass). The paper is dedicated to the subsequent optimization phase: the identification of the anomalous object, the normalization of its specific electricity consumption, and a preliminary engineering assessment of the local generating unit's
capacity.
The object of the research is the Mayakovka village in the Kemerovo Region (Kuzbass).
The authors perform the comparison of actual versus normalized specific electricity consumption basing on a continuous dataset spanning 48 months. The average magnitude by which actual values exceed the normative baseline is determined. It is shown that the equivalent average power of a compensating source amounts to approximately 28 kW; however, for more stable compensation of the additional energy demand, it is advisable to consider a preliminary design range for the installed capacity of 32–70 kW. The research substantiates an operating scheme for the local generation unit in parallel with the centralized grid, wherein the external network serves as the primary reserve. The results can be applied in the preliminary selection of distributed generation parameters for other rural areas with abnormal electricity consumption.
Keywords
About the Authors
I. N. PaskarRussian Federation
Ivan Nikolayevich Paskar, Senior Lecturer
Power Supply of Mining and Industrial Enterprises Department
650000; Vesennaya St., 28; Kemerovo
AuthorID (RSCI): 786435, AuthorID (SCOPUS): 57202332941, ResearcherID: R-6973-2016
A. S. Ustyuzhanina
Russian Federation
Anastasia Sergeevna Ustyuzhanina, Master’s Student
Power Supply of Mining and Industrial Enterprises Department
650000; Vesennaya St., 28; Kemerovo
AuthorID (RSCI): 1335364
V. V. Artemasov
Russian Federation
Valery Valerievich Artemasov, Candidate of Technical Sciences, Associate Professor
Power Supply of Mining and Industrial Enterprises Department
650000; Vesennaya St., 28; Kemerovo
AuthorID (RSCI): 262472
References
1. Grisales-Noreña L. F., Restrepo-Cuestas B. J., Cortés-Caicedo B. [et al.]. Optimal location and sizing of distributed generators and energy storage systems in microgrids : A review. Energies. 2023;16(1):106. doi: 10.3390/en16010106. EDN: COASYU.
2. Nogueira W. C., Garcés Negrete L. P., López-Lezama J. M. Optimal allocation and sizing of distributed generation using interval power flow. Sustainability. 2023;15(6):5171. doi: 10.3390/su15065171. EDN: GAMPBB.
3. Jain A., Gupta S. C. Optimal placement of distributed generation in power distribution system and evaluating the losses and voltage using machine learning algorithms. Frontiers in Energy Research. 2024;12:1378242. doi: 10.3389/fenrg.2024.1378242. EDN: COYMJZ.
4. Hussein Farh H. M., Al-Shamma’a A. A., Qamar A. [et al.]. Optimal sizing and placement of distributed generation under n-1 contingency using hybrid crow search–particle swarm algorithm. Sustainability. 2024;16(6):2380. doi: 10.3390/su16062380. EDN: SGQFNY.
5. Bouchikhi N., Boussadia F., Bouddou R. [et al.]. Optimal distributed generation placement and sizing using modified grey wolf optimization and ETAP for power system performance enhancement and protection adaptation. Scientific Reports. 2025;15:13919. doi: 10.1038/s41598-025-98012-0. EDN: FCMNED.
6. Khenissi I., Guesmi T., Alshammari B. M. [et al.]. A hybrid chaotic bat algorithm for optimal placement and sizing of DG units in radial distribution networks. Energy Reports. 2024;12:1723–1741. doi: 10.1016/j.egyr.2024.07.042. EDN: JZBTFQ.
7. Iqbal H., Stevenson A., Sarwat A. I. Impact analysis and optimal placement of distributed energy resources in diverse distribution systems for grid congestion mitigation and performance enhancement. Electronics. 2025;14(10):1998. doi: 10.3390/electronics14101998. EDN: CJTLJN.
8. Valencia-Díaz A., Hincapié R. A., Gallego R. A. Optimal placement and sizing of distributed generation in electrical dc distribution networks using a stochastic mixed-integer LP model. Arabian Journal for Science and Engineering. 2025;50:5835–5851. doi: 10.1007/s13369-024-09655-6. EDN: TNPXSA.
9. Castellanos-Buitrago S. F., Maya-Duque P., Villa-Acevedo W. M. [et al.]. Enhancing energy microgrid sizing: a multiyear optimization approach with uncertainty considerations for optimal design. Algorithms. 2025;18(2):111. doi: 10.3390/a18020111. EDN: OTPOAZ.
10. Karve G. M., Thakare M. S., Vaidya G. A. Optimal siting and sizing of battery energy storage system in distribution system in view of resource uncertainty. Energies. 2025;18(9):2340. doi: 10.3390/en18092340. EDN: BLWSUW.
11. Kudrin B. I. Vydeleniye i opisaniye elektricheskikh tsenozov. Izvestiya Vysshikh Uchebnykh Zavedeniy. Elektromekhanika. 1985;7:49–54. (In Russ.).
12. Gnatyuk V. I., Kivchun O. R., Vasil’yev V. N., Lutsenko D. V. Metodika monitoringa elektropotrebleniya elektrotekhnicheskogo kompleksa Kaliningradskoy oblasti. Industrial Energy. 2015;3:26–35. EDN: TNGDEJ. (In Russ.).
13. Gnatyuk V. I., Kivchun O. R., Ilyushin P. V. Parametricheskaya adaptatsiya dannykh ob elektropotreblenii ob”yektov regional’noy energosistemy na osnove rangovogo analiza. Industrial Energy. 2020;10:48–56. EDN: HJXNGB. (In Russ.).
14. Kivchun O. R., Gnatyuk V. I. Methodology for determining the Z2-energy saving potential objects of the regional electrotechnical complex. Marine Intellectual Technologies. 2021;4-4(54):94–98. doi: 10.37220/MIT.2021.54.4.003. EDN: XWFKBD. (In Russ.).
15. Kivchun O. R. Regime rationing of the power consumption of objects of the regional electrotechnical complex on the basis of vector rank analysis. Industrial Energy. 2023;4:48–58. EDN: ZSVDKB. (In Russ.).
16. Paskar I. N., Frolova M. V. Interval assessment of technocenosis by the electric power consumption parameter on the example of Prokopievsky district of Kuzbass. Mining Machines and Automatics. 2020;5(151):64–70. doi: 10.26730/1816-4528-2020-5-64-70. EDN: DEREMW. (In Russ.).
17. Zavyalov N. V., Paskar I. N., Lebedev G. M. Application of the digital (Z-) forecasting method when normalizing the technocenosis of the regional power system. Mining Machines and Automatics. 2023;5(169):22–30. doi: 10.26730/1816-4528-2023-5-22-30. EDN: GNOBDZ. (In Russ.).
18. Zavyalov N. V., Paskar I. N., Lebedev G. M. Study of regional energy systems using the technocentric approach. Mining Machines and Automatics. 2024;2(172):39–50. doi: 10.26730/1816-4528-2024-2-39-50. EDN: LMPBXG. (In Russ.).
Review
For citations:
Paskar IN, Ustyuzhanina AS, Artemasov VV. Justification of preliminary sizing and interconnection scheme for a distributed generation unit serving an area with abnormal power demand. Omsk Scientific Bulletin. 2026;(3):80-87. (In Russ.) https://doi.org/10.25206/1813-8225-2026-199-80-87. EDN: UBWTLM
JATS XML